Abstract

Workplace accidents are all unplanned events that result in or have the potential to cause injuries, illnesses, damage, or other losses (AS/NZS 4801, 2001 Standard). The objectives of this study are to identify potential hazards associated with the Fire Fighting System Work of the 150 KV SKTT Project at the Suramadu Bridge and to apply the HIRARC method to identify risks associated with this work. This research is descriptive in nature and utilizes a mixed methods analysis, combining both quantitative and qualitative approaches. The study is conducted on the construction work of the 150 KV High Voltage Cable Channel (SKTT) from GI Kenjeran to Tower 35 Bangkalan, passing through the Suramadu Bridge in Surabaya, East Java. The object of this research is the Fire Fighting System Work of the 150 KV SKTT Project at the Suramadu Bridge. An illustration of the research object has been taken from Google. The population in this study consists of employees who are involved in the construction work of the 150 KV High Voltage Cable Channel (SKTT) from GI Kenjeran to Tower 35 Bangkalan, totaling 50 people. Based on the results of the risk assessment, it is revealed that there is 1 risk (4%) classified as Extreme Risk, 4 risks (17%) as High Risk, 6 risks (25%) as Moderate Risk, and 13 risks (54%) as Low Risk.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.