Abstract

This study aims to analyze the recruitment process carried out by PT. Kereta Api Indonesia DAOP 9 in Jember in order to meet the need for manpower. The method used is descriptive qualitative research by observing, interviewing, and direct documentation. The results of this study indicate that the recruitment process of PT. KAI is carried out by following the company's Workload globally. Recruitment conducted by PT. KAI is a process of fulfilling the need for workers in each branch office. Thus, in practice it does not prioritize the needs of each but prioritizes the needs of PT. Indonesian Railways as a whole. The implementation policy is carried out based on the results of the head office's considerations and decisions to obtain workers according to the existing qualifications and apply the same in each branch.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.