Abstract
As one of the MRO (Maintenance, Repair, Overhaul) company PT ABC had the significant problems in the last 3 years, including concerns regarding the difficulty of determining the amount of material availability and timing of procurement the material appropriate to support maintenance activities. In this case the components studied are two type brake of aircraft the first one is brake assembly and the second one is brake Goodrich which installed on B737-800 aircraft NG. Based on historical data, in last 3 years PT ABC have a number of component shortage that continues to grow, in last year PT ABC had 12 unit shortage component for brake assembly and 13 unit shortage component for brake goodrich. It is gave the negative impact for company and also customer PT ABC. To overcome these problems need to be analyzed how to determine the accuracy the number of brake requests that will removal in future periods which resulting the accuracy of the flight time (dispatch reliability/delay time). The proccess in this reserach first determine the life time of brake, determine the quantity of removal brake, schedule of removal brake, account the forecast of requirement brake in next years and determine the planning of material requirement for maintenance proccess. The forecasting using single exponential smoothing methode to determine forecasting result of brake requirement in 2017. This methode consider the smallest standar error estimate of forecasting demand to get the exact result. Morever MRP (material requirement planning) methode used to determine the procurement components planning (Petition Requirement Planning) with forecasting data from previous year's demand. Based on studies result showed that the quantity of brake assembly and brake Goodrich types that should be available for the removal of as many as 13 units per each type of brake for a period in 2017, while the limit (age component) of brake assembly 38 days and 41 days for brake Goodrich and the estimation schedule of brake removal is the last date installation brake plus the actual age of brake that has determined the schedule of brake assembly in 21st of the months 12 and the 2nd of the month 11 for brake Goodrich and result are showed that MRP decrease the shortage of brake assembly 1 unit and decrease the shortage of brake goodrich 2 unit.
Highlights
As one of the MRO (Maintenance, Repair, Overhaul) company PT ABC had the significant problems in the last 3 years, including concerns regarding the difficulty of determining the amount of material availability and timing of procurement the material appropriate to support maintenance activities
Goodrich and result are showed that MRP decrease the shortage of brake assembly 1 unit and decrease the shortage of brake goodrich 2 unit
Strategies and Tactics in Supply Chain EventManagement: Proactive Event Management in the Supply Chain of Aircraft Spareparts. Germany: Springer Berlin Heidelberg
Summary
Pengelolaan perawatan pesawat, mulai pengadaan suku cadang (sparepart) sampai pada perawatan (maintenance) nya tidak selalu ditangani oleh perusahaan penerbangan itu sendiri. Salah satu kegiatan perusahaan MRO yaitu adanya perbaikan proses khususnya dari sisi pengadaan material atau BDP Berdasarkan studi lapangan dan data historis yang di ada pada perusahaan, PT ABC kerap kali menemukan permasalahan yang cukup signifikan dalam 3 tahun terakhir, diantaranya mengenai kesulitan penentuan jumlah ketersediaan material dan penentuan waktu pengadaan material yang tepat, dalam hal ini komponen yang di bahas ialah brake (rem) pesawat Boeing B737-800 NG. Permasalahan ini akan berdampak pada ketepatan waktu pengadaan komponen untuk kebutuhan maintenance. Dalam penelitian ini penulis akan membahas tentang analisa pengadaan material berdasarkan tingkat utilisasi dan nilai MTBR dari data yang tercatat pada sistem perusahaan
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.