Abstract

The purpose of this study was to determine the inventory control of raw material (cement) inCV. Dua Bersaudara, Kupang. The method used is the Economic Order Quantity, SafetyStock and ReOrder Point. The results of the study showed that the total cost of cement rawmaterial inventory using the EOQ method is smaller than the method used by the company.CV. Dua Bersaudara, Kupang should try to apply the EOQ method in terms of raw materialinventories so that the company can minimize inventory costs. Keywords: Economic Order Quantity, Safety Stock and Re-Order Point

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.