Abstract

The implementation of construction development is strongly influenced by the payment sistem implemented. The contractor as the executor of construction activities with predetermined costs, will definitely suppress the implementation costs that will be issued in various ways through financial management, including based on the payment sistem carried out. The research was conducted on the Al Ukhuwah Mosque construction project, which is located in the Avany complex, BSD, Banten. The study was conducted by an experimental cash flow analysis with a 25% and 50% down payment sistem, using the PDM method with EST conditions. The results obtained from the 2 experiments show that a job with a 50% down payment will provide a profit of 12,01% or an overdraft value of Rp. 79.250.000,-.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.