Abstract

Flexible pavement is designed with regard to the load that will be received in order to achieve optimal performance throughout its service life. However, conditions in the road reveal indications of overloading by each category of vehicles, especially overload vehicles. Driyorejo industrial area road is a provincial road that connects the main industrial areas in Gresik Regency. With traffic dominated by overload vehicles, especially large trucks carrying a lot of goods, indications of damage to the pavement are becoming increasingly clear and obvious. This research aims to assess the impact of traffic load on the remaining life expectancy of flexible pavement, focusing on the load of vehicles crossing the road in the Driyorejo industrial area as the study variable. The calculation method used is the Bina Marga 2017 Method. The data used are Average Daily Traffic (LHR) data and vehicle load data. From the calculation results, the actual traffic growth (i) value is 32.7%. Vehicle overloading causes a decrease in the planned life of the road as indicated by the truck factor value of 1.06. The Remaining Life (RL) calculation represents a 14% decrease from the standard RL value of 69.3% to 55.3% under overload conditions, so it can be concluded that the overload significantly reduces the life of the road which was originally designed for 10 years to only 7 years.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.