Abstract
This article was written to design a social-based business idea project that creates organic fertilizer products from processed coffee grounds. Seeing the trend of increasing consumption of coffee drinks in various circles encourages business opportunities for coffee shop businesses, especially in Batam City. The waste generated by the coffee shop is coffee grounds from the brewing process which will be disposed of after the product extraction process. Coffee grounds are known to have benefits as plant fertilizer. The result of this business idea design is a product called PUBUK (Pupuk Powder Kopi). The research method applied in writing this article is a qualitative research method, the data used is in the form of descriptive and narrative which is processed into a narrative form, as well as the data analysis technique used in this study, namely inductive data analysis. The results of this research are that the PUBUK project has succeeded in creating organic fertilizer products. This project has fulfilled the three variables contained in the Project Management Triangle, namely time, cost, and scope to produce good quality products. The next stage that needs to be carried out in this project is sustainable marketing related to PUBUK products on social media.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.