Abstract
The International Airport Sultan Aji Muhammad Sulaiman (SAMS), Sepinggan Balikpapan is the gateway to East Kalimantan and is an airport with high aircraft movements every year. Periodic maintenance must be carried out to support airport performance. Runway surface overlay and paved shoulders is one of the works carried out for this purpose. In a construction project, good management is needed to control so that the project runs according to the planned time and cost. Earned Value Analysis (EVA) is one method that can be used to control projects. After analyzing using project data from week 1 to week 47, it is known that the costs incurred are greater than the budgeted value, this is indicated by the CPI value = 0.998. The implementation time is faster than the planned schedule, as seen in the SPI value of 1.142. The result of the final calculation of the project which indicates a loss and an estimated turnaround time of 65 weeks indicates a 4 week acceleration.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.