Abstract

There will undoubtedly be heavy traffic in this location, especially at the intersection of Jalan Padat Karya, as Prabumulih is one of the cross-Sumatra cities with heavy traffic. The second economic hub of Prabumulih City is the Karya Intensive Road. When primary data collecting takes place in the field, descriptive and quantitative research methodology is employed. 7 days a week, Monday through Sunday, from 07.00 to 18.00. Road width measurements are made on the spot at each approach using a measuring tool. Following the collection of all primary and secondary data, analysis will be conducted utilizing PTV Vissim Version Student for traffic modeling and the 2023 PKJI Book. Intersection performance analysis using PKJI 2023 produces results traffic flow is 836.2 pcu/hour, free flow speed is 43.70 km/hour, capacity of 1468 pcu/hour, degree of saturation of 0.85. Based on the results above, the service level flow section is D. The intersection model after being given a signal changes if using APILL with 2 phases because of the level of service that occurs changed to level A.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.