Abstract

This research aimed to analyse the financially of feasibility and break even point of power plant. This is a case study at PT Gunung Madu Plantations, Lampung. Data collection was conducted in May 2017 and was analyzed by financially analysis and break even point analysis. The investment of power plant at PT Gunung Madu Plantations financially wass feasible, with NPV value of Rp1,437,425,146,844; Net B/C of 7.00; Gross B/C of 1.81, IRR of 34.84 percent, and payback periode of 1.75. Amount of revenue and electricity produced by PT Gunung Madu Plantations has reached break even point. The result of this analysis showed that the average of BEP revenue was Rp32,548,133,618 and BEP electricity production was 49,994,808 KWh. Key words: bagasse, break even point, financially

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.