Abstract

Implementation of a building construction project carried out through a certain management system. The project has a predetermined schedule and implementation plan. Common things that will occur if they are not in accordance with the schedule and implementation plan are delays in project implementation time and implementation costs. One of the factors causing the delay is due to rework activities on one or several items of construction work. The purpose of this study was to identify and analyze the factors that cause rework on building construction projects in the city of Kupang, East Nusa Tenggara Province. This study used a questionnaire instrument involving as many as 27 contractors, consisting of 12 site managers, 12 field implementers and 3 foreman. This research was conducted to see the dominant factor of rework in building construction projects in Kupang city. The results showed that the factors causing rework are known from managerial, design and resource factors which are the main causes of the emergence of rework in work. Operators working not according to procedures are one of the main causes of rework from the resource factor. Lack of teamwork is the cause of the rework of managerial factors. Unclear design or documentation is the cause of rework of design factors.

Highlights

  • Rework adalah pekerjaan ulang yang diakhibatkan karena kesalahan-kesalahan dari suatu proyek konstruksi

  • This research was conducted to see the dominant factor of rework in building construction projects in Kupang city

  • The results showed that the factors causing rework are known from managerial, design and resource factors which are the main causes of the emergence of rework in work

Read more

Summary

PENDAHULUAN

Rework adalah pekerjaan ulang yang diakhibatkan karena kesalahan-kesalahan dari suatu proyek konstruksi. Bisa ditimbulkan karena dalam pelaksanaan suatu proyek tidak memperhatikan kualitas dari proyek yang sedang dikerjakan. Analisis ini secara khusus digunakan untuk mengetahui faktor-faktor penyebab rework pada pelaksanaan proyek konstruksi di Kota Kupang. Dengan demikian diharapkan dapat meningkatkan performa dan kualitas dari suatu proyek yang sedang berjalan tersebut. Berdasarkan catatan Pos Kupang (selasa, 12 januari 2016), ternyata ada begitu banyak proyek konstruksi bangunan gedung yang mengalami keterlambatan waktu karena berbagai macam persoalan dan salah satunya adalah pekerjaan ulang (rework). Hasil dari penelitian ini diharapkan dapat bermanfaat dan dijadikan bahan masukan bagi para pengambil keputusan dan penyelenggara proyek yang ada di Kota Kupang agar dampak dari pekerjaan ulang (rework) dapat diantisipasi di masa yang akan datang

TINJAUAN PUSTAKA
Metodologi Penelitian
ANALISA DAN PEMBAHASAN
Peringkat Faktor Penyebab Terjadinya Rework Berdasarkan Tingkat Kepentingan
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call