Abstract

The aim of this research is to explain the factors that affect the cost of clean water production, the level of efficiency of production costs, and calculate the cost of goods sold in PDAM Tirta Daroy. Estimation methods Ordinary Least Square (OLS) is used to estimate the parameters of the water production cost is the amount of water production and the rate of leakage. The analysis shows the number of water production affect positively and significantly to the cost of water production. In the regression analysis results obtained 1 +

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.