Abstract

No construction work has the same progress—various factors as the cause of inequality. A positive progress deviation indicates good construction work. Otherwise, it is said to be bad if it has a negative value. The uncertain nature of the construction work causes 3 (three) possible scenarios of the value of the deviation of progress so that the three values ​​form one value of the deviation of the expected progress. Deviations of value greater than 10% for a duration from 0 to 70% are categorized as binding contracts. This study aims to determine the deviation of the progress of 25 construction works. The research method was quantitative. Data collection was carried out on 25 construction works that had been carried out. Data was taken from contractors directly. The results of the data analysis show that when 25%D is obtained, 10 poor-performing construction jobs, Next for 30%D construction work. 50%D and 70%D underperformed 9, respectively; 9; and 8. The largest positive progress deviation value is 15,362 at S70%D. The expected value of the largest progress deviation is positive 1.763. By knowing the value of negative progress expectations, contractors should control delays before the contract is completed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.