Abstract

<p class="Abstract"><span>This study aims to determine the cost of education units using the Activity Based Costing method at the Al-Islam Islamic Boarding School in Yogyakarta. This research was descriptive research with a quantitative approach. Interviews, documentation, and observation were used to collect research data. The data were analyzed using a comparative descriptive analysis method. The study’s results showed that the determination of unit costs using the ABC system was higher than the cost of education set by Islamic boarding schools. These results indicate an under-cost position. Under-cost means that the actual cost is lower than the cost according to the calculation of Activity Based Costing because several costs are not detailed/identified and not charged to the students by the Islamic Boarding School.</span></p>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.