Abstract
The existence of buildings has an important role in human life according to the purpose of the building. After completion of a building is expected to be able to carry out its functions according to the age of the plan. The purpose of this study is to estimate the cost of maintenance and care at the Pekanbaru Customs and Excise Service Office based on PERMEN NO.24 / PRT / M / 2008. It is expected that with this system, maintenance and maintenance activities will be in accordance with applicable standards and retain the use and value of the building. Regulation of the Minister of Public Works Number: 24 / PRT / M / 2008 concerning guidelines for building maintenance and maintenance, building maintenance This research was conducted using the Approximate Estimate method using the highest average unit price per m² of storey buildings for buildings accurate building as a guideline.he results of the calculation of this study found the estimated cost estimate of rough estimate (approximate estimate) of Rp. 16.156.679,93, - when compared with the calculation of the building price of Rp. 11.483.051,200 - the percentage of costs for maintenance of buildings in Pekanbaru Customs Service Office is only 0,1407% of the total price of the building, so that it can be categorized in the level of minor damage (<35%). Whereas the annual maintenance fee is Rp. 319.792.000,00, - in 2020 which is expected to increase every year based on the value of inflation based on Bank Indonesia.
 
 Keywords: Estimation, Maintenance, Maintenance, Offices spase
Highlights
The existence of buildings has an important role in human life according to the purpose of the building
Regulation of the Minister of Public Works Number: 24 / PRT / M / 2008 concerning guidelines for building maintenance and maintenance, building maintenance This research was conducted using the Approximate Estimate method using the highest average unit price per m2 of storey buildings for buildings accurate building as a guideline.he results of the calculation of this study found the estimated cost estimate of rough estimate (approximate estimate) of Rp. 16.156.679,93, - when compared with the calculation of the building price of Rp. 11.483.051,200 - the percentage of costs for maintenance of buildings in Pekanbaru Customs Service Office is only 0,1407% of the total price of the building, so that it can be categorized in the level of minor damage (
No., Pp.[1,2,3,4,5,6,7,8,9,10,11,12], ISSN : 2715-0690
Summary
Gedung Bea dan Cukai yang berlokasi di Jalan Jenderal Sudirman Nomor 2-4, Kampung Dalam Senapelan merupakan satu dari Kantor Pelayanan Bea dan Cukai yang bertempat di Kota Pekanbaru. Kegiatan yang dilakukan untuk menjaga, memperbaruhi dan juga pemperbaiki semua fasilitas yang ada sebagai bangunan agar tetap berada pada kondisi sesuai standar yang berlaku dan mempertahan kegunaan serta nilai dari bangunan tersebut disebut dengan pemeliharaan. Berdasarkan latar belakang maka akan dilakukan suatu penelitian untuk menganalisis kerusakan komponen bagian gedung dan mengestimasi biaya pemeliharaan dan perawatan gedung kantor pelayanan Bea dan Cukai Pekanbaru, supaya bangunan yang di bangun tentunya juga harus mendapatkan skala prioritas penanganan pemeliharaan pada bangunan kantor pelayanan Bea dan Cukai Pekanbaru. Harapannya dengan adanya sistem ini, suatu penanganan pemeliharaan dan perawatan gedung berada pada kondisi sesuai standar yang berlaku serta mempertahan kegunaan dan nilai dari bangunan tersebut
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.