Abstract

This study aims to analyze 1) the criteria that determine the budget allocation for drainage development activities at the Banjarmasin City PUPR Service, 2) Alternative drainage development activities at the Banjarmasin City PUPR Service, 3) Budget allocation preferences for drainage development activities at the Banjarmasin City PUPR Service. Eight respondents in the study are considered influential in determining the budget allocation for drainage development activities at the Department of Public Works and Spatial Planning Banjarmasin using the AHP method. The results of the study show that alternative criteria for HR, Benefits, and Funds can determine the budget allocation for drainage development activities with the highest order of preference, namely Funds (54%), Benefits (29%), and Human Resources (0.17%). Based on these criteria, the preference for budget allocation for drainage development activities is Operation Maintenance of Drainage System (39%), Construction of Environmental Drainage System (24%), Rehabilitation of Urban Drainage Channels (20%), and Improvement of Environmental Drainage Channels (18%). With the conclusion that the most dominant is the Operation and Maintenance of Drainage Systems (39%).

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.