Abstract

Currently, the energy we use is still using fossil energy. In the future, the need for energy will increase because every year there is a large population growth. If you still use fossil energy and don’t find new energy alternatives, then Indonesia will experience a severe energy crisis and certain places will experience blackouts. One of the efforts so that the wind energy crisis can be minimized is to utilize natural energy that has the potensial to generate energy such as the Wind Power Plant. In this study, planning and simulation of Wind Power Plant were carried out to help reduce the use of fossil energy and help the needs of the community in the Talise Beach area. From the results of the study that the average output of wind turbine production is 1,180/hour winh a maximum production of wind turbines per day of 5,665 kW and the construction system cost (NPC) of Rp. 91,340,660,000. Electrical energy that can be generated from wind turbines by utilizing an area of about 42,021.67 m2 is 10,332,498 kWh/year with a total unfulfilled power of 1,416 kW/year. Lack of power or unmet load can be overcome by the existence of a grid/network.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.