Abstract

TasGon is a product made from jute sack waste which is then processed into a useful product. In this project the burlap sack is processed into a bag called TasGon. This TasGon has many benefits, namely it can reduce the waste of burlap sacks that are wasted everywhere. In this study the authors used qualitative and descriptive research methods. This research is continued by analyzing project management, namely Project Integration, Project Scope Management, Project Time Management, Project Cost Management, Project Quality Management, Project Human Resource Management, Project Communication Management, Project Risk Management, Project Procurement Management, Project Stakeholder Management. The results of this study indicate that TasGoni has many benefits that can be felt by many people. Therefore the project undertaken must be in accordance with the quality of the product produced.
 Keywords: Project Management, Gunny Sack, Waste

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.