Abstract

This study is to investigate compatibility between installed main engine in ship with propeller design using theoretical approach and data series. A triple screw rescue boat conducted hard chain hull was used for study and analyze the effect of the changes in powering process stage by observing the result of open water efficiency based on Wageningen Data Series with cavitation analysis has been neglected. The study is considered using intersection between propeller thrust with thrust coefficient and open water efficiency on Wageningen B-Series for fixed pitch propeller. The result indicated that propeller characteristic B5-76 with 41% of efficiency has compatibility with specification of installed main engine.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.