In an effort to meet customer needs on supplying electricity in the industrial era 5.0, it needs to have good services which keep growing up and be innovative. One of them is running a premium service which guarantees better quality of service than that of the regular. This research will discuss all of the obstacles that can disrupt the continuity of electricity supply to the customer with premium services, starting from the disruptions at the supply side until at the installation owned by the customer. From the analysis result, ATS (Automatic Transfer Switch) failed several times on working so that caused a black out at the customer side which it should be avoided. Therefore, it is necessary to make some adjustments on setting and wiring to some problems which may arise so that the potential disruption of the ATS or equipment failure can be suppressed. This research aims to minimize and even eliminate ATS performance failures due to system disturbances by implementing rewiring, adding a permissive interlocking system and adding a PLC with a time delay setting.

Highlights

  • In an effort to meet customer needs on supplying electricity in the industrial era 5.0, it needs to have good services which keep growing up and be innovative

  • This research will discuss all of the obstacles

  • that can disrupt the continuity of electricity supply to the customer

Read more

Summary

Pendahuluan

PT PLN (Persero) adalah perusahaan jasa pelayanan penyediaan tenaga listrik. PLN membangkitkan tenaga listrik, menyalurkan dan mendistribusikan kepada para pelanggan. Dalam hal ini PLN menyediakan satu layanan yang mempunyai keunggulan dibanding layanan reguler biasa yaitu layanan premium dimana layanan tersebut lebih menjamin keberlangsungan supply tenaga listrik kepada konsumen, tentunya dengan harga yang lain daripada. Untuk mendukung layanan premium Dari beberapa dasar yang telah dijelaskan diatas maka pada beberapa pelanggan tersebut PLN menggunakan 2 tujuan penelitian ini adalah: sumber dari trafo Gardu Induk yang berbeda serta pada gardu Cubicle yang dipasang pada pelanggan juga di lengkapi dengan sistem ATS (Automatic Transfer Switch) yang memungkinkan supply akan berpindah secara otomatis bila supply utama mengalami gangguan. Metode Penelitian mengalami permasalahan kegagalan switch dan Dalam menyusun penelitian ini diperlukan adanya flow berdampak pada terhentinya supply aliran listrik kepada chart agar dapat berjalan sesuai dengan perencanaan pelanggan. Alur metodologi penyelesaian jurnal terhentinya proses produksi maupun dari sisi PLN yang penelitian ini dapat digambarkan dalam flow chart terkena konsekuensi dari hal tersebut yaitu berupa denda gambar 1: yang harus dibayarkan kepada pelanggan. 3) Nilai frekuensi,baik nilai satu gelombang penuh maupun nilai setengah gelombang

Studi Literatur
Analisa Data Gangguan
Hasil dan Pembahasan lepas sempurna maka perintah untuk memasukkan
Penambahan Time Delay
Kesimpulan
Bapak-ibu Dosen Pendidikan Teknik Elektro yang memberikan ilmu selama kuliah
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call