Abstract

This paper deals with the performances obtained in full scale anaerobic digesters co-digesting waste activated sludge from biological nutrients removal wastewater treatment plants, together with different types of organic wastes (solid and liquid). Results showed that the biogas production can be increased from 4000 to some 18,000 m3 per month when treating some 3-5 tons per day of organic municipal solid waste together with waste activated sludge. On the other hand, the specific biogas production was improved, passing from 0.3 to 0.5 m3 per kgVS fed the reactor, when treating liquid effluents from cheese factories. The addition of the co-substrates gave minimal increases in the organic loading rate while the hydraulic retention time remained constant. Further, the potentiality of the struvite crystallisation process for treating anaerobic supernatant rich in nitrogen and phosphorus was studied: 80% removal of phosphorus was observed in all the tested conditions. In conclusion, a possible layout is proposed for designing or upgrading wastewater treatment plants for biological nutrients removal process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.