Abstract
An upper bound solution of tube drawing process using a fixed tapered plug has been obtained, which reduces to a solution for tube sinking by setting friction factor between tube and plug at zero. Effects of various process parameters have been discussed based on the solution.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.