Abstract

Under frequency load shedding (UFLS) is an important measure to tackle with frequency drop caused by load-generation imbalance. In existing schemes, loads are shed by relays in a discontinuous way, which is the major reason leading to under-shedding and over-shedding problems. With the application of power electronics technology, some loads can be controlled continuously, and it is possible to improve the UFSL with continuous loads. This paper proposes an UFLS scheme by shedding loads continuously. The load shedding amount is proportional to frequency deviation before frequency reaches its minimum during transient process. The feasibility of the proposed scheme is analysed with analytical system frequency response model. The impacts of governor droop, system inertia, and frequency threshold on the performance of the proposed UFLS scheme are discussed. Cases are demonstrated to validate the proposed scheme by comparing it with conventional UFLS schemes.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.