Abstract
PurposeThe purpose of this paper is to illustrate an uncertain programming model for scheduling of preventive maintenance (PM) actions. The PM scheduling, in which PM actions are performed under fixed intervals, is solved by grey systems theory.Design/methodology/approachThe paper applied the grey evaluation method based on triangular whitenization weight functions which includes two classes: endpoint evaluation method and center-point evaluation method.FindingsTwo methods give the same results based on endpoint and center-point triangular whitenization weight functions. For validation, the results were compared by Cassady’s method.Originality/valueThe scheduling of PM is crucial in reliability and maintenance engineering. Hundreds of parts compose complex machines that require replacement and/or repairing. It is helpful to reduce the outage loss on frequent repair/replacement parts and avoid lack of maintenance of the equipment by controlling the equipment maintenance frequency.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.