Abstract
High voltage power cables and their accessories are vital components of the electrical power network. Because of this, reliable operation over their lifetime is essential to minimize failures during service. As in-service failures most often incur very high costs, condition monitoring of high voltage cable accessories is becoming increasingly of interest and is being applied. Monitoring of partial discharge (PD) is currently the most common method implemented. This article discusses the fundamental aspects of PD and its measurement on high voltage power cable accessories. The article begins with discussing the various PD measurement techniques, which are explained and compared. Finally, the results of typical measurements on high voltage cable accessories are shown, and their consequences in operation are discussed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.