Abstract

In project management there are two main operation problems like scheduling and cost optimization. These are correlated with each other and have good mathematical proved solutions for the basics. In case of applying arbitrary calendars generates such effects in scheduling which make the time -cost trade-o problem unusable. The aim of this paper is to point out these effects and give an advance to find a new way to the problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.