Abstract

The expansion of the Brookhaven accelerator facilities, and the on-going efforts to raise the AGS beam intensity, have been a driving force for the addition of new kickers and the upgrading of older ones to meet this challenge. All kicker power supply systems are running above their design specifications to provide wider operating ranges. The newly upgraded Booster fast extraction kicker power supply was commissioned in September 1997. Its compact high voltage modulator structure offers a pulse length almost three times longer than the preceding package within the confines of the same physical space. The AGS A5 injection kicker and the AGS G10 extraction kickers are also discussed. In order to expedite design, assembly, and commissioning, and to facilitate interchangeability, standardized modules have been adopted where possible. This paper gives an overview of the AGS and Booster fast injection and extraction kicker systems including their parameters, structure and status.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call