Abstract

Claims in the construction sector result from, but not limited to, poor contract performance, delays, conflicts and force majeure. The use of Multi-Criteria Decision Making (MCDM) techniques are proposed in construction-related decision-making and prove advantageous in ensuring that claims management processes are effective. This paper provides an overview of existing MCDM techniques proposed for construction claims management. A narrative literature review is performed where Google Scholar and EBSCO host are used to identify relevant articles for the study and 49 articles were selected. From literature, some of the proposed techniques in construction claims management are AHP, ANN, NN, MAUT, SWOT, TOPSIS and VIKOR. Findings from the study indicate that the outdated nature of traditional standalone MCDM techniques has seen the use of hybridised models in construction-related decision-making more useful. Supplementing MCDM techniques with techniques such as BIM is rather relevant since BIM alone has the potential to reduce claims emerging from large construction projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.