Abstract
Current research on the resource-constrained multi-project scheduling problem (RCMPSP) mainly focuses on the constrained resources or other single uncertainty factor that cannot satisfy the practical need of enterprise management. This paper addresses the dynamic uncertain multi-project scheduling problem (DUMPSP), which alleviates the above problem of RCMPSP by synthesizing the analysis of uncertainty, sensitivity, and lean management of resources and durations. An outer---inner uncertainty fuzzy cellular automata algorithm (OIUFCA) is proposed to solve DUMPSP. The problem is divided into several parts: (1) fuzzy cell is employed to describe the project cell and process cell in DUMPSP; (2) a fuzzy outer cellular automata (FOCA) model is defined to solve the project scheduling of DUMPSP, and a fuzzy inner cellular automata (FICA) model is constructed to solve the process scheduling; (3) multi-level feedback strategy (MFS) is further proposed to deal with the multi-level dual-stage optimization problem of DUMPSP. Besides, FOCA and FICA model execute co-evolution under the control of MFS. Extensive experiments are carried out to evaluate the performances of OIUFCA with other state-of-the-art algorithms. It is revealed that OIUFCA achieves a better performance in success rate and convergence speed in solving DUMPSP, and OIUFCA has a good solution under different conditions of uncertainty, sensibility, and lean management.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Similar Papers
More From: Soft Computing
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.