Abstract

This paper presents a new optimization method for reactive-power planning of a subtransmission network under normal operating conditions. The planning problem is divided into a master problem and two subproblems. The master problem is to determine yearly investment in reactive-power compensation devices for expected load growth over a planning horizon. The subproblems are to determine the optimal operation of the power system under normal conditions. The master problem is reduced to a yearly Hamiltonian minimization problem, thereby reducing the dimensionality-of-optimization algorithm. Two subproblems, P-optimization and Q-optimization, both minimize the fuel requirement using a unified approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.