Abstract

This study is motivated by a real case study and addresses the material supply problem at assembly lines. The aim of the study is to optimally schedule the delivery of raw material at assembly lines while using the minimum number of vehicles. To cope with the problem an original mixed integer linear programming model has been proposed based on the assumptions and constraints observed in the case study. The validity of the model has been examined by solving several real cases and analysing different scenarios. The results of the study show the efficiency and effectiveness of the model.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.