Abstract
This paper presents a physically based model and formulation for industrial load management. The formulation utilizes an integer linear programming technique for minimizing the electricity costs by scheduling the loads satisfying the process, storage and production constraints. The proposed strategy is evaluated by a case study for a typical flour mill with different load management options. The results show that significant reductions in peak electricity consumption are possible under time of use tariffs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.