Abstract

Although airlines plan aircraft routes and crew schedules in advance, perturbations occur everyday. As a result, flight schedules may become infeasible and would need to be updated. This Day of Operations Scheduling problem impacts the entire system of an airline as the decisions enforced are final. When perturbations are relatively small, the airline may be able to at least preserve the planned aircraft and crew itineraries. We propose a model that determines new flight schedules based on planned crew transfers, rest periods, passenger connections, and maintenance. Its dual is shown to be a network model, hence solvable in a real-time environment. In addition, it can be used in more sophisticated operational and planning systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.