Abstract

In this paper, an economic production scheduling policy for deteriorating items with shortages and variable production schedule time is developed. The items are deteriorating at a constant rate, the production rate and the demand rate is considered as functions of time (time varying). The proposed model facilitates managers in determining the optimal number of production cycles and optimal replenishment schedule over a finite planning horizon in order to keep the total relevant cost as low as possible. The method is illustrated by a numerical example and a sensitivity analysis of the optimal solution with respect to parameters of the system is also carried out.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.