Abstract

The collaboration of vendor and buyer is one of the key factors for successful supply chain management. The most common strategy for a collaborative system is to propose an integrated replenishment plan aimed at maintaining a win-win partnership for both vendor and buyer. The objective of this study is to develop a production and shipment model for a system that incorporates learning effect and deteriorating items and to derive an optimal joint total cost from the integrated perspective of both vendor and buyer. A simple solution procedure is presented to determine the optimal production time and number of deliveries. A numerical example is provided to illustrate the proposed model. A sensitivity analysis is conducted to study the effect of changes in the related parameters on the optimal solution. This paper shows that the proposed integrated model can result in a significant cost reduction as compared with the independent decisions made by either vendor or buyer.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call