Abstract
Permutation generation is an important problem in combinatorial computing. In this paper we present an optimal parallel algorithm to generate all N! permutations of N objects. The algorithm is designed to be executed on a very simple computation model that is a linear array with N identical processors. Because of the simplicity and regularity of the processors, the model is very suitable for VLSI implementation. Another advantageous characteristic of this design is that it can generate all the permutations in minimal change order.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.