Abstract
The optimal operation of a flotation circuit, which is used to separate two minerals is discussed. The optimal control of the flotation circuit at Lake Dufault is found to be a bang-bang control, to contain a singular sub-arc, or to be totally singular depending on the various practical constraints. The influence of the time-delay on the optimal control of the flotation circuit is then investigated. Although the influence of the delay is quite significant, the basic structure of the optimal policy remains roughly the same. Thus it is not unreasonable to ignore the delay, although the optimality suffers from this.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.