Abstract

ABSTRACT This paper proposes an opportunistic preventive maintenance policy to schedule tamping interventions aiming to minimize the total maintenance cost. In this policy, the goal is to obtain an opportunistic maintenance threshold (OMT) to decide when to perform preventive tamping operations on given railway segments to minimize total maintenance cost associated with tamping operations. A steady-state genetic algorithm was used to simultaneously find an OMT threshold and tamping scheduling. The proposed approach is tested on data collected from a ballasted railway track. The results show that by taking into consideration an OMT threshold, machine preparation cost can be reduced by about 46%. Moreover, by performing a sensitivity analysis of the tamping effectiveness, it is observed that the negative impact of inefficient tamping is greater than the positive impact of efficient tamping on the total maintenance cost and track quality in this case study.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.