Abstract

PurposeThe purpose of this paper is to focus on finding the optimal maintenance interval and the minimum maintenance cost for redundant system, considering environment factors.Design/methodology/approachThe authors propose a decision model with environment-based preventive maintenance for the repairable redundant system. Referring to the k-out-of-n model and Proportional Hazard Model, the reliability analysis is completed for the redundant system affected by internal and external issues. Meanwhile, the maintenance cost for the redundant system is divided into two categories: the fixed maintenance cost involving whole system replacement at the time of system failure, and the cost to replace failure components when the system still functions.FindingsUpon the required reliability analysis, an optimal maintenance interval that minimizes the average maintenance cost per unit time is identified. The simulation results indicate that the optimal maintenance interval with consideration of environmental factors is significantly shorter than that without consideration of these factors, with the maintenance cost increase within 10 percent.Practical implicationsThe redundant systems have widely been used in industries including the aero craft control system and warship power system. The model could be applied in the more real case considering the types of components and the operation environment, and help production managers better maintain machines by increasing the safety and reliability of the redundant model with the more frequent inspection.Originality/valuePrevious research of redundant system always focuses on internal degradation, while ignoring the reliability analysis for a redundant system with various multiple components under the influence of environment. However, this work could fill the theoretical gap, i.e. simultaneously consider both environmental and internal factors for a redundant system with non-homogeneous components. Meanwhile, the proposed superior model increases the reliability and safety of the k-out-of-n model with reasonable cost. Production managers could benefit a lot from this as well.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.