Abstract
This paper considers a combination of the joint replenishment problem with single machine scheduling. There is a single resource, which is required by all the unit-time jobs, and a job can be started at time point t on the machine if and only if the machine does not process another job at t, and the resource is replenished between its release date and t. Each replenishment has a cost, which is independent of the amount replenished. The objective is to minimize the total replenishment cost plus the maximum flow time of the jobs. We consider the online variant of the problem, where the jobs are released over time, and once a job is inserted into the schedule, its starting time cannot be changed. We propose a deterministic 2-competitive online algorithm for the general input. Moreover, we show that for a certain class of inputs (so-called p-bounded input), the competitive ratio of the algorithm tends to sqrt{2} as the number of jobs tends to infinity. We also derive several lower bounds for the best competitive ratio of any deterministic online algorithm under various assumptions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.