Abstract

The paper presents usage of an artificial neural network (ANN) for the on-line determination of the ready reserve (RR) required for compensation of power deficit in power systems. The power deficit usually results after generator outage or failure of the other means of ensuring the operational reserve. RR consists of rapid start-up generating units such as gas turbines and hydro plants. Due to the stochastic nature of the power system operation, the amount of ready reserve is essential for balancing the power system operating states in perturbed conditions. For that purpose, an ANN using back-propagation learning rule could yield the amount of ready reserve. Prompt assessment of the appropriate amount of RR minimizes the potential reduction of quality of electrical energy delivered to customers and, consequently, maintains a high reliability of the power system as a whole.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.