Abstract

Utilities use operating reserve to cope with the disturbances. To ensure that the operating frequency and system security are well maintained, the operating guidelines always specify that the reserve quantity and response rate should meet some prescribed levels. This paper proposes methodologies to evaluate system's frequency response characteristic (beta) and operating reserve for the isolated power system. With the presented algorithm to estimate system's beta online, a real-time allocation of operating reserve would be feasible to meet the guidelines for either regulation or contingency operation. Test results from the simulated conditions, and from the actual operating data verify the merits of the proposed methodologies to system's frequency control, and reliability.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.