Abstract

Formwork is one of the essential elements of construction work in traditional reinforced concrete building construction. In addition to being complicated work, formwork is labor intensive and requires numerous, highly-skilled formwork carpenters. Labor accounts to over 50% of the cost of formwork, a large percentage relative to other types of basic construction work. To increase formwork efficiency, it is necessary to improve work methods. While productivity of formwork has been the focus of previous studies, effective work data such as detailed work processes or man-hours were not sufficiently obtained. This paper reports on an observational study carried out on fifteen building construction projects using work-study techniques, specifically work processes, man-hours, and number of workers in each work process. It highlights the process analyses of a typical formwork construction project and discusses the results of a statistical analysis of labor productivity related to all construction projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.