Abstract
A mixed integer linear programming (MILP) model is proposed for the reformation of natural gas pipelines. The model is based on the topology of existing pipelines, the load and pressure at each node and the design factors of the region and minimizes the annual substitution depreciation cost of pipelines, the annual construction depreciation cost of compressor stations and the operating cost of existing compressor stations. Considering the nonlinear pressure drop equations, the model is linearized by a piecewise method and solved by the Gurobi optimizer. Two cases of natural gas pipeline networks with hydrogen injection are presented. Several adjustments are applied to the original natural gas pipeline network to ensure that our design scheme can satisfy the safety and economic requirements of gas transportation. Thus, this work is likely to serve as a decision-support tool for the reformation of pipeline networks with hydrogen injection.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.