Abstract

This paper develops an MILP model for designing multi-period natural gas transmission network to determine the connections of pipeline and the sites of compressor stations with consideration of terrains and obstacles. Equations of mass balance of network nodes, pressure drop of pipelines and pressure increase of compressors are all taken into account. A piece-wise linearization method is applied to the model. Four cases of natural gas transmission networks in Shanxi province (China) are studied. The result illustrates that the model can tackle complicated natural gas transmission network optimization problems. The developed model is of practical value for natural gas sales enterprises to minimize the construction cost and is a good designing reference for construction contractors.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.