Abstract
In order to improve the reconstruction performance for ill-posed emission tomographic problems with limited projections, a generalized interpolation method is proposed in this paper, in which the virtual lines of projection are fabricated from, but not linearly dependent on, the measured projections. The method is called the virtual projection (VP) method. Also, an iterative correction method for the integral lengths is proposed to reduce the error brought about by the virtual lines of projection. The combination of the two methods is called the iterative virtual projection (IVP) method. Based on a scheme of equilateral triangle plane meshes and a six asymmetrically arranged detection system, numerical simulations and experimental verification are conducted. Simulation results obtained by using a non-negative linear least squares method, without any other constraints or regularization, demonstrate that the VP method can gradually reduce the reconstruction error and converges to the desired one by fabricating additional effective projections. When the mean square deviation of normal error superimposed on the simulated measured projections is smaller than 0.03, i.e., the signal-to-noise ratio (SNR) for the measured projections is higher than 30.4, the IVP method can further reduce the reconstruction error reached by the VP method apparently. In addition, as the regularization matrix in the Tikhonov regularization method is updated by an iterative correction process similar to the IVP method presented in this paper, or the Tikhonov regularization method is used in the IVP method, good improvement is achieved.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.