Abstract

Estimating the cycle time of each job in a wafer fabrication factory is a critical task to every wafer manufacturer. In recent years, a number of hybrid approaches based on job classification (either preclassification or postclassification) for cycle time estimation have been proposed. However, the problem with these methods is that the input variables are not independent. In order to solve this problem, principal component analysis (PCA) is considered useful. In this study, a classifying fuzzy-neural approach, based on the combination of PCA, fuzzy c-means (FCM), and back propagation network (BPN), is proposed to estimate the cycle time of a job in a wafer fabrication factory. Since job classification is an important part of the proposed methodology, a new index is proposed to assess the validity of the classification of jobs. The empirical relationship between theSvalue and the estimation performance is also found. Finally, an iterative process is employed to deal with the outliers and to optimize the overall estimation performance. A real case is used to evaluate the effectiveness of the proposed methodology. Based on the experimental results, the estimation accuracy of the proposed methodology was significantly better than those of the existing approaches.

Highlights

  • The competition in the semiconductor industry has been very intense

  • That is why this paper studies the estimation of job cycle time in a wafer fabrication factory

  • Estimating the cycle time of each job in a wafer fabrication factory is a critical task to the wafer fabrication factory and has been widely studied in recent years

Read more

Summary

Introduction

The competition in the semiconductor industry has been very intense. How to obtain and maintain the competitive edge is an important task for all manufacturers in this industry. Quick response and on-time delivery are obviously pressing needs for any modern enterprise. To this end, accurate estimating and shortening the cycle time (flow time or manufacturing lead time) of each job in the factory is a prerequisite [1,2,3,4,5,6,7,8,9]. In a wafer fabrication factory, a job is usually composed of about 25 pieces of wafers and has hundreds of steps to be processed. A wafer fabrication factory is classified as a complicated reentrant production system

Objectives
Methods
Findings
Conclusion