Abstract

In this work, we tackle the problem of scheduling a set of jobs on a set of unrelated parallel machines with minimising the total weighted completion times as performance criteria. The iterated greedy metaheuristic generates a sequence of solutions by iterating over a constructive heuristic using destruction and construction phases. In the last few years, iterated greedy has been employed to solve a considerable number of problems. This is because it is based on a very simple principle, it is easy to implement, and it often exhibits an excellent performance. Moreover, scalability for high-dimensional problems becomes an essential requirement for modern optimisation algorithms. This paper proposes an iterated greedy model for the above-mentioned scheduling problem to tackle large-size instances. The benefits of our proposal in comparison to existing metaheuristics proposed in the literature are experimentally shown.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call