Abstract

Mineral Resources EngineeringVol. 10, No. 01, pp. 53-69 (2001) Technical NotesNo AccessAN INVESTIGATION OF QUALITY CONTROL CHARTS FOR AUTOCORRELATED DATAB. SAMANTA and A. BHATTACHERJEEB. SAMANTADepartment of Mining Engineering, Indian Institute of Technology, Kharagpur, 721302, West Bengal, India Search for more papers by this author and A. BHATTACHERJEEDepartment of Mining Engineering, Indian Institute of Technology, Kharagpur, 721302, West Bengal, India Search for more papers by this author https://doi.org/10.1142/S0950609801000464Cited by:2 PreviousNext AboutSectionsPDF/EPUB ToolsAdd to favoritesDownload CitationsTrack CitationsRecommend to Library ShareShare onFacebookTwitterLinked InRedditEmail AbstractAn application of the Shewhart control charts for quality monitoring and control requires an assumption that observations are independent and normally distributed. An assumption of independence of quality related data in mining operations is questionable, as autocorrelation amongst the observations becomes an inherent characteristic in mineral deposits where ore grades are spatially distributed. This phenomenon led to an examination of other types of control charts namely modified Shewhart chart, special cause control chart, and common cause control chart to capture the autocorrelation among observations while constructing control charts. An investigation of these charts was conducted in an iron ore mine and the behaviour of the charts was studied on three quality characteristics namely, Fe%, SiO2% and Al2O3%. The results suggest that the serial correlation of the observations has substantial effect on the performance of the conventional Shewhart chart. The effectiveness of the control charts was compared using the sliding simulation approach. It was revealed that the modified Shewhart chart and the special cause control chart provided a higher probability of coverage than the conventional Shewhart chart. Therefore, it was inferred that the conventional Shewhart chart generated false alarm of out of control situation, which in turn revealed that the modified Shewhart chart and special cause control chart are more appropriate in a correlated environment. For the case study mine, it was also revealed that the modified Shewhart chart and special cause control chart behaved in a similar way. FiguresReferencesRelatedDetailsCited By 2Drinking water quality control: control charts for turbidity and pHSermin Elevli, Nevin Uzgören, Deniz Bingöl and Birol Elevli26 September 2016 | Journal of Water, Sanitation and Hygiene for Development, Vol. 6, No. 4Max-Chart for Autocorrelated ProcessesK. Thaga, P. M. Kgosi and L. Gabaitiri1 Jan 2007 | Economic Quality Control, Vol. 22, No. 1 Recommended Vol. 10, No. 01 Metrics History PDF download

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call