Abstract
The construction industry in the Kingdom of Saudi Arabia (KSA) is a significant sector in the Middle East, with annual expenditures exceeding USD 120 billion. It employs 15% of the workforce and consumes more than 14% of the country’s energy resources. Despite the significant growth in the Saudi construction sector, it faces various challenges due to the rapid launch of mega projects, such as the Line project engaged with the NEOM project, as well as other new projects as part of the Saudi Vision 2030. The challenges might be limited to a shortage of skilled labourers, rising costs, construction disputes, and material shortages. This study aims to investigate claims management procedures under traditional practice and compare them with a proposed BIM package as an alternative solution to mitigate construction disputes. The objective of the study focuses on reducing the time consumed when analysing claims against the level of accuracy of claims values. The proposed BIM model improves and streamlines the claims process through automation. This study presents prospective and retrospective methods in delay analysis under an accepted programme. A questionnaire survey was conducted, and out of a total of 123 practitioners, 79 replied. The findings in tables in this article reveal that there are demands and a growing awareness of BIM in the KSA construction industry. The results reveal that BIM can help to reduce potential disputes and can reduce overall project cost overruns.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have